| Bunks replaced |
All wooden bunks replaced with bed-bug-resistant metal bunks |
2025 |
| Cabin 48 |
Complete renovation with new roof, siding, doors, back deck replaced with composite, drop ceiling removed, bathroom renovated, fans added, LVP floor |
2025 |
| Gathering Place Building |
remodeled interior, restored exterior, new metal roof, LVP flooring, bathrooms renovated, HVAC system added, ceiling painted, new home for our sensory room and alumni room! |
2025 |
| Chalet 2 |
Demolished |
2025 |
| Namie Hall (Old Dining Hall) |
New bathrooms and new sound system with Bluetooth capabilities |
2025 |
| Arts & Crafts Building |
Remodeled with new roof, siding, door, windows, back door closed in and new table space added, center island doubled, shelves rebuilt |
2025 |
| Health Center |
New metal roof, new vinyl shake siding |
2025 |
| Younger Overnight Tents |
Build a new standalone structure made with metal roofs, vinyl siding, and composite floor |
2024 |
| 3 New Transport Vans |
Van A (Ford Transit, Low Roof, 12 passengers), Van B (Ford Transit, Medium Roof, 15 Passengers), Van D (Kia Carnival) |
2024 |
| Volunteer Cabins |
Replace carpet with LVP flooring, vinyl shake siding, metal roof, insulation underneath, washer and dryer added |
2024 |
| Dining Hall Floor |
New LVP Floor |
2024 |
| Sports Shed (old office) |
External Remodel, new windows, metal roof, doors, and vinyl siding |
2024 |
| New pool basketball hoops |
Basketball hoops are replaced |
2024 |
| New Altar Cloths for Chapel |
Old altar cloths replaced |
2024 |
| New signage around camp |
Camp map and signage at the Welcome Lodge, signs pointing to St. Raphael’s grave, etc. |
2024 |
| Replace 15-passenger vans |
Our 15-passenger vans are replaced |
2024 |
| Replace Minivan E |
New minivan purchased |
2024 |
| Namie Hall (Old Dining Hall) |
New roof, doors, windows, decks, front porch built, floors, HVAC, insulation, ceiling fans, fireplaces redone, back porch rebuilt |
2024 |
| Pool Cover |
New pool cover for winter |
2024 |
| Shrines of SS Raphael, Thekla, and Artemius |
New Shrines and structures |
2023 |
| Security System for Camp |
Install megaphones on pavilion, health center, an lodge to convey emergency information |
2024 |
| New tables for the Dining Hall |
Replace large round tables with more space saving long tables that fold up |
2023 |
| Pavilion |
New posts, siding, and shed roof replaced |
2023 |
| Health Center |
New porch roof |
2023 |
| Old infirmary |
Complete renovation |
2023 |
| St. Thekla Outdoor Chapel |
Wooden benches replaced with new benches – trex composite |
2023 |
| Volunteer cabins |
New flooring in the bathrooms installed, rotten wood underneath replaced |
2023 |
| All Cabins & Buildings |
Renamed after Saints and icons and signs installed |
2023 |
| St. Ignatius Chapel |
Refinish main floor, replace carpeting in altar & altar server room & basement with vinyl flooring. Altar server room gets new folding table, basement bathrooms renovated and floor flattened |
2023 |
| Tractor |
Purchased a new tractor for use around camp |
2022 |
| Male Staff Cabin & Cabins 38-39 |
New cabin for the male support staff and brand new cabins 38-39 |
Spring 2022 |
| Basketball Hoops |
New basketball hoops were installed on new basketball court |
Spring 2022 |
| St. Ignatius Chapel |
Replaced siding, new side and back doors, all windows and back windows replaced. |
Spring 2022 |
| Small Basketball Court |
Court repaved and extended into a second large basketball court |
2021 |
| Full Time Housing |
McCurdy house and property, and Snyder house and property were purchased |
2021 |
| Old Cabin 38 |
Convert cabin into a laundry room |
2020 |