AV’s Dream Board
AV Camp Wishlist
Item | Description | Est. Cost |
New sound system for Pavilion | We would like a permanent sound system in the Pavilion – 4 speakers in the corners in the rafters up high. These will connect to a rack that will be stored in the shed during the summer and moved indoors during the winter, while the speakers will stay outside year round. This will enable us to plug in to the system rather than having to set up portable speakers every day that get bumped and damaged easily. | $10,000 |
A/V Equipment for Namie Hall | Once we remodel the Old Dining Hall we want to have proper A/V equipment for presentations, guest speakers, etc. | $20,000 |
Remodel Log Cabin | Complete remodel of existing building | $27,000 |
Repave parking lot | Our parking lot has lots of cracks and needs to be repaved | $35,000 |
Remodel Old 38 | Replace siding, windows, doors | $36,000 |
Playground | Have a playground for children and families | $50,000 |
Repave Track | The road around the camp has several cracks and uneven places that need to be repaired and replaced. | $50,000 |
Repave road to sewer plant | This road also has several cracks and spots where the road has washed out. | $50,000 |
Intern Housing | Build a new facility with housing for interns and full time staff that can be used for summer staff as well | $300,000 |
Expand St. Ignatius chapel | Widen the chapel so it is twice as large | $1,000,000 |
Replace swimming pool with a water park | Our current swimming pool is over 70 years old and has many maintenance issues. | $1,000,000 |
Expand Lodge | Our office is far too small for our needs. We hope to add offices, a chapel, an alumni room, and meeting spaces. | $2,000,000 |
All Wooden Buildings | Install vinyl siding that looks like cedar shakes, and replace all decks with Trex composite material. | $48,000 per building ($1,210,000 total) |
Recreation Center | Connect the Old Dining Hall, New Dining Hall, & Gathering Place with an indoor gym, rock wall, all-purpose rooms, etc. Turn the Gathering Place into an Alumni Museum. | Unsure |
Cemetery | Have a cemetery for those who wish to be buried at the Village. This will enable us to teach more about death and the Resurrection and have memorial services for the departed. | Unsure |
Program Dreams |
---|
Adult Iconography Camp |
Orthodox Scout Retreat |
Clergy Family Retreat |
Single Parent Camp |
Staffing Dreams |
---|
Full-Time Chef / Kitchen Manager |
A second Program Director / Guest Groups Coordinator |
Grant Writer |
Upcoming Projects
Project | Description | Completed |
---|---|---|
Old Dining Hall | Complete renovation | In progress |
Arts & Crafts Building | Complete remodel | In progress |
Sensory Room | Build a room on the back of the Health Center to be used as a sensory room for campers who struggle with the noise and stimulation of camp. | In progress |
Younger Overnight Tents | Build a new standalone structure | In progress |
Remodel Cabin 48 | Complete renovation | In progress |
Health Center | Replace rest of the roof with metal roof | In progress |
Completed Projects
Project | Description | Completed |
---|---|---|
Volunteer Cabins | Replace carpet with vinyl flooring | 2024 |
Dining Hall Floor | Replace Floor | 2024 |
Sports Shed (old office) | External Remodel | 2024 |
New pool basketball hoops | Basketball hoops are replaced | 2024 |
New Altar Cloths for Chapel | Old altar cloths replaced | 2024 |
New signage around camp | Camp map and signage at the Welcome Lodge, signs pointing to St. Raphael’s grave, etc. | 2024 |
Replace 15-passenger vans | Our 15-passenger vans are replaced | 2024 |
Shrines of SS Raphael, Thekla, and Artemius | New Shrines | 2024 |
Replace Minivan E | New minivan purchased | 2024 |
Pool Cover | New pool cover for winter | 2024 |
Security System for Camp | Install megaphones on pavilion, health center, an lodge to convey emergency information | 2024 |
New tables for the Dining Hall | Replace large round tables with more space saving long tables that fold up | 2023 |
Pavilion | New posts & siding | 2023 |
Health Center | New porch roof | 2023 |
Old infirmary | Complete renovation | 2023 |
Outdoor Chapel | New benches – trex composite | 2023 |
Volunteer cabins | New flooring in the bathrooms installed, rotten wood underneath replaced | 2023 |
All Cabins & Buildings | Renamed after Saints and signs installed | 2023 |
St. Ignatius Chapel | Refinish main floor, replace carpeting in altar & altar server room with vinyl flooring | 2023 |
Tractor | Purchased a new tractor for use around camp | 2022 |
St. Ignatius Chapel | Refinish main floor, replace carpeting in altar & altar server room with vinyl flooring | 2022 |
St. Ignatius Chapel | New siding and windows | 2022 |
Cabins | New Male Staff cabin and cabins 38-39 constructed | 2022 |
New Basketball Court | New hoops installed | 2022 |
Small Basketball Court | Repaved and extended to be a second full-size basketball court | 2021 |
Old Cabin 38 | Converted into Laundry Room- new washers and dryers installed | 2020 |